Custom theme

Tron Light ChatGPT Theme

A rider leans into a luminous cyan lightcycle amid bright trails and shards. The wheels and streaming lines span the width of the image.

A custom theme example made with StylerGPT. Not included in the extension’s built-in theme collection.

ChatGPT
How can I help you today?

Theme settings

Mode
Light
Color palette
Cyan
Background
Image
Font
Lora

Bubble colors

User messages

Text #20232a

Assistant messages

Text #20232a

Background

How this custom theme is designed

The cool cyan controls take their cue from “the cyan lightcycle”. Lora provides a literary tone without sacrificing clear letterforms. Pale opaque prompts and near-white answers keep the wallpaper outside the text surfaces, with dark text for sustained reading.

Use StylerGPT to add your own wallpaper, apply these colors and font, and customize the result for your ChatGPT workspace.

Make ChatGPT feel more personal without giving up readability

StylerGPT lets you combine your own wallpaper with deliberate colors, fonts, and message surfaces, then adjust the result in your actual workspace.

"I've been trying to figure out how to change the theme of the ChatGPT interface. This extension makes my work a lot more fun."

"Does well what it promises. Changes the theme, color scheme, and fonts as needed. Recommend it."

Amit Saxena

Amit Saxena

Read reviews

"It's honestly so simple and clean. Easy to use and makes GPT conversations more fun to use."

Arnt Evensen

Arnt Evensen

Read reviews

"I found this extension on my very last search, and it meets all my needs. Or rather, it's exactly what I needed."

Viktor Bartuszek

Viktor Bartuszek

Read reviews

"I've been using StylerGPT for a few months, and it's been a fantastic addition to my browser."

"I'm on a Chromebook, and unfortunately the font changed to Arimo, so I got this app to restore the previous font."

Erick Lopez

Erick Lopez

Read reviews

"ChatGPT has a purpose and serves it well, but the interface was never to my liking. You made it just as I wanted."

Abhilash Pillai

Abhilash Pillai

Read reviews

"As someone with ADHD, I'm astonished at how cumbersome, drab, and archaic some UI choices still feel. This makes the experience much easier to live with."

Zoe Thomas

Zoe Thomas

Read reviews

"A good change for the ChatGPT theme. It gives more feel to work, and personal images make it even more attractive."

Swanaya Gupta

Swanaya Gupta

Read reviews

"Amazing and super useful extension. ChatGPT has never been so beautiful."

Lera Kuntsevich

Lera Kuntsevich

Read reviews

"The themes and image selection are beautiful, and it truly allows a personalized experience when using ChatGPT."

Kristopher Ryan

Kristopher Ryan

Read reviews

"Excellent application. I would only add an option to change the background automatically every day."

Isaac Maffeis

Isaac Maffeis

Read reviews

Recreate the Tron Light look in your own ChatGPT workspace

Install StylerGPT, add a wallpaper you choose, apply the documented settings, and keep refining the result until it works for your conversations.

Try full Power access for 7 days. Keep five power-ups with included limits after your trial.